Our customer BAFCO Group from Bahrain already started the civil works of his pulses processing factory “mainly Lentils and Chana Dal” with a production capacity of 80 tons/day in one single production line.

The pulse processing plant is located in the industrial area of Al Hidd, a town in Bahrain that is located on a sand spit on the southeastern extremity of Muharraq Island.

Silos Córdoba has provided the complete storage solution for its first project in this country.

The turn-key storage facility includes:

  • Intake pit for truck reception.
  • 3 hopper silos mod 9.17/09 45º with a total storage capacity of 2.517 cubic meters.
  • All the necessary catwalks towers and supports.
  • Complete ventilation system.
  • Complete temperature control system.
  • Complete cleaning system 75 Tons/hour
  • Loading handling equipment 75 Tons/hour. “Bucket elevators and chain conveyors”.
  • Unloading handling equipment 40 Tons/hour. “Bucket elevators and chain conveyors”.
  • Control panel with PC+PLC including SCADA system.

3D view of BAFCO’s factory coming soon in Bahrain – Hidd Industrial Area

Need more information?

Request a no obligation quote

Казахстан | Silozuri în România

Subscribe To Our Newsletter

Subscribe To Our Newsletter

Join our mailing list to receive the latest news and updates from our team.

Marketing Permissions

You have Successfully Subscribed!

Share This